<strike id="u8ask"></strike>
  • <ul id="u8ask"><center id="u8ask"></center></ul>
  • <samp id="u8ask"></samp>
    <strike id="u8ask"></strike>
    <samp id="u8ask"></samp>
  • 中文版 | English
     
    服務 Ignition
    服務 Wall wiper
    服務 Wood base
    服務 Winch rope
    服務 Kom rotator
    服務 Wheel packing
    服務 Drilling steel
    服務 Rotation pole
    服務 Conservation rubber
    服務 Liquid-gas separator
    服務 Hydraulic winch
    服務 Vacuum degasser
    服務 Blowout preventer
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/4/1 
      Wo Hing Petroleum ... 2011/3/31 
      Wo Hing Petroleum ... 2011/3/31 
    Name: Langfang HeXing Petroeum Equipment
    Add: in the eastern ring road oil base village
    Tel: 15810047588
    Fax: 0317---2558811
    Mail: hx060718@yahoo.cn
    Product: staff@hexing.net.cn
    Location: Home >> Message details
      Wood base

       點擊圖片放大 

       詳細介紹
    Ⅰ Rig mat type
            
    Ⅱ Rig mat using
    Rig mat is mainly used for the equipment foundations of different drilling sites, such as derrick substructure, mud hog, purification can, engine house, tank car, jug, etc. It is convenient to install and has long performance life.
     
    Ⅲ Rig mat structure
    Frame of rig mat is welded by the H type steels, with excellent larches or camphor woods in it. After the antiseptic treatment, the woods are clamped by M39 extended bolts.
    Ⅳ Main parameter list
     Rig mat parameter list
    Specification
    Length /mm
    Width /mm
    Thickness /mm
    Weight/Ib
    HGM8′×40′×6″
    12192
    2438.4
    160
    11973
    HGM8′×30′×6″
    9144
    2438.4
    160
    9043
    HGM8′×25′×6″
    7620
    2438.4
    160
    7604
    HGM8′×15′×6″
    4572
    2438.4
    160
    4273
     
    Ⅴ Method of application
    Rig mat can be used in any earth surface, especially in the weak formation. For the broad contact areas between rig mat and ground, it can be set on the ground directly if fulfilled the qualifications as below:
    Bearing pressure on foundation≥0.06Mpa
    Ground flatness≤40mm
     
    Ⅵ Rig mat advantages
        Frame of rig mat is welded by the H type steels, with excellent larches or camphor woods in it after the antiseptic treatment. It is able to bear pressure and convenient to carry.
       
    Ⅶ Notice
    1、            Use only certified lifting devices when moving in case of accidents.
    2、  Clean the oil stains of surface every week.
    3、  Inspect the surface of rig mat, in case of odds and ends affect the stationarity of equipment.
    Add to Favorites| Home |Contact
    All rights reserved:Langfang HeXing Petroeum Equipment Add:in the eastern ring road oil base village
    Tel:15810047588 Fax:0317---2558811
    Technical Support:Hao Lian Wang Luo
    主站蜘蛛池模板: 国产成人av在线免播放观看| bt天堂网...www在线资源| 天天影视色香欲性综合网网站| 无遮挡h肉动漫网站| 亚洲欧美日韩综合一区| 花季传媒app下载免费观看大全 | 日本视频免费高清一本18| 任你躁在线播放视频| 香蕉成人伊视频在线观看| 大香伊蕉国产av| 久久66久这里精品99| 欧美国产亚洲一区| 公与2个熄乱理在线播放| 黄录像欧美片在线观看| 国内外成人免费视频| 中文字幕在线播放视频| 欧美三级中文字幕在线观看 | 97热久久免费频精品99| 抽搐一进一出gif免费视频| 亚洲人成在线精品| 精品一区二区三区在线观看视频| 国产成人理在线观看视频| a大片大片网y| 无码一区二区三区亚洲人妻| 亚洲国产超清无码专区| 精品亚洲一区二区三区在线播放| 国产成人刺激视频在线观看| 你懂的国产视频| 女同性之间同床互摸视频| 久久国产欧美日韩精品| 欧美日韩激情在线| 六月丁香激情综合成人| 美女巨胸喷奶水视频www免费| 国产成人无码区免费A∨视频网站| ww4545四虎永久免费地址| 天天摸天天干天天操| 丰满少妇被猛烈进入高清播放| 日韩中文字幕不卡| 亚洲国产精品成人综合色在线婷婷 | 欧美日韩高清在线| 亚洲欧美在线播放|